MALAYSIA · ROOF INSULATION

Roof insulation for
factories in Malaysia.

Hot areas under the roof? AC struggling to keep up? We assess heat entering through the roof, walls and openings, then plan reflective-barrier work and measurement.

Factories and warehouses operated by Japanese and local companies · mainly roofs of approximately 800–2,000 m²

Team installing reflective barrier sheets at a Malaysia project
Actual installation in Malaysia.

01 · FACILITIES & LOCATIONS

Find the heat path.
Define the right scope.

Facilities to assess

Factories and warehouses with sun-exposed metal roofs, cooled offices and work areas. We check whether roof and wall heat is a major cause, alongside existing insulation, ventilation and operating conditions.

If internal equipment is the main heat source

If furnaces, ovens or production equipment dominate the heat load, roof and wall work alone may have limited benefit. Extraction and ventilation also need consideration.

Tell us your facility location, including Kuala Lumpur, Selangor (Shah Alam / Port Klang), Johor or Penang. ASAHI, the Malaysia contact, will review the site details.

JAPAN · FACTORY INSTALLATION EXPERIENCE

Installation expertise
built in Japanese factories.

Reflective barrier installation inside a factory in Japan
Photo: R-CRAFT factory installation in Japan.

R-CRAFT

Our installation partner has worked on heat-control projects since 2008. Experience with factory roofs and ceilings informs diagnosis and site-specific installation planning.

View the factory project in Japan →

Japan installation experience and Malaysia pilot data inform the assessment; each facility requires its own plan.

02 · SHAH ALAM, MALAYSIA

Installed in Shah Alam.
Measured before and after.

Reflective sheets were fitted to the roof and walls of one air-conditioned office in Shah Alam. AC power before and after installation was compared by outdoor temperature.

47.9%AC power reduction at 32°C outdoor temperature
Line chart comparing AC power before and after installation at outdoor temperatures of 26–36°C
A comparison estimated from measured data, not whole-building bill savings. Roof and wall effects cannot be separated, and the same reduction is not established for other facilities.
Read the pilot conditions and details →

03 · METHOD & PROCESS

Diagnose, install
and verify the change.

A reflective sheet limits radiant heat transfer at an aluminium surface facing an air gap. The air gap, fixing, condensation and inspection access are designed for the building.

  1. 01

    Diagnose heat paths

  2. 02

    Measure conditions

  3. 03

    Design the scope

  4. 04

    Coordinate installation

  5. 05

    Measure again

Malaysia · measure first. First 3 sites free.

Start with spot measurements of surface temperature, WBGT and AC power. We agree the location, measurement points and schedule beforehand. Uncooled areas focus on surface temperature and WBGT. Availability of the free offer and its scope are confirmed after enquiry. No installation contract is required.

04 · TEAM & CONTACTS

Local engineering.
Japan’s installation expertise.

MALAYSIA · ENQUIRIES

ASAHI ENGINEERING
(MALAYSIA) SDN. BHD.

Coordinates local engineering and installation arrangements, drawing on HVAC and building-services expertise.

nobumasa-igi@asahikogyosha.co.jp
+60 12-601 7874

E-28-01, Menara Suezcap 2, KL Gateway, No. 2, Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200 Kuala Lumpur, Malaysia

R-CRAFT

JAPAN · INSTALLATION EXPERTISE

R-CRAFT

With nearly 20 years in heat-control work since 2008, extensive factory experience supports precise, site-specific installation.

HouScape

JAPAN · PROJECT COORDINATION

HouScape Inc.

Connects headquarters and local teams, coordinating diagnosis, installation arrangements and measurement planning.

info@h-scape.com

05 · RELATED GUIDES

Explore the method and evidence.

06 · ENQUIRY

Tell us where
the heat is hurting.

Start with the location and heat problem. Area and drawings can be confirmed later. ASAHI is your first contact in Malaysia.

nobumasa-igi@asahikogyosha.co.jp

Measurement & heat-control enquiry

First response: ASAHI · * Required

Start with the location and heat problem. Area, AC details and drawings can be confirmed later.

Initial information review is free. The first 3 measurement sites are free, subject to agreed eligibility, scope and scheduling. Additional investigation and installation are scoped separately.