For facility teams and project owners

Factory & warehouse heat-control guides

Decision guide

Why a Malaysian factory needs heat diagnosis before roof work

Roof, walls, openings and process equipment can all affect a hot factory. Start with the occupied area and operating conditions to choose the scope.

Malaysia pilot

Malaysia heat-control pilot: installed, measured and analysed

A Shah Alam office in Malaysia showed about 35% lower condition-adjusted estimated AC power after roof and wall work. Read the method and remaining limitations.

Decision guide

What are radiant-barrier sheets? Materials and installation for factories

A reflective sheet is one part of a heat-control system. Understand the material, installation details and measurements before choosing a solution.

Decision guide

Roof coating vs radiant barrier: choosing heat control for a Malaysian factory

Compare where coatings, reflective barriers, insulation and ventilation act before specifying work for a Malaysian factory or warehouse.

Project planning

Before rooftop solar: inspect factory roof heat and waterproofing

When a solar project puts the roof on the agenda, review its condition and heat paths together. Agree access, responsibilities and measurement before work starts.