Factory & warehouse heat control · Malaysia & Singapore

Factory heat control.
From diagnosis
to measured results.

Installation experience in Japan.
Local verification in Malaysia.

For facilities in Malaysia and Singapore, we assess the roof, walls and openings, then design suitable heat-control work using reflective barrier sheets. We coordinate local installation and measured verification.

JAPAN

Industrial heat-control
installation experience.

Published manufacturing-facility projects by our construction partner R-CRAFT.

Partner’s Japan projects →

MALAYSIA

Installed and measured
in Shah Alam.

HouScape’s local pilot compares estimated AC power before and after roof and wall work.

Shah Alam pilot results →
Factory & warehouse focusDesigned for operational sites
Local executionDelivered with local partners
Clear scope before workDiagnosis, proposal and assumptions
Data after workEvidence, not slogans
01 · The problem

Before adding cooling,
find where heat enters.

When solar heat keeps entering through the roof, walls or openings, air conditioning must fight the same load every day. The first question is not “Which material?” It is “Where is the heat entering?”

Wrong place, wasted investment. Diagnosis protects the budget.
01

High cooling load

The AC runs hard because heat keeps entering the building envelope.

02

Unstable indoor temperature

Hot zones and temperature swings can affect people, storage and production.

03

Unclear ROI

Without a baseline and assumptions, savings claims cannot guide an investment decision.

04

Quality varies on site

Material performance alone does not guarantee installation performance.

02 · Diagnosis & heat-control method

Diagnose the heat path.
Design the right reflective barrier.

Reflective heat-control sheets reduce radiant heat transfer when installed alongside an air space. We assess the roof, walls and openings first, then specify the installation your building needs.

Diagram showing three factory heat-entry paths through the roof, wall and openings 01 · Diagnose
Start by finding the dominant heat path.

Heat can enter through the roof, walls or openings. The dominant source differs by building, so the scope should follow diagnosis—not assumption.

Reflective sheet being fitted at the ceiling and wall junction02 · Reflective sheet
A thin sheet with reflective aluminium surfaces.

The material combines aluminium foil on both faces with polyethylene and bubble layers. The reflective surfaces reduce radiant heat transfer; we specify air spaces, joints and fastening to suit the building.

Photo: actual installation. How radiant-barrier sheets work →

From diagnosis to measured results

STEP 01

Diagnose

Review the building, operating conditions and heat-entry paths.

STEP 02

Design

Specify sheet placement, air spaces and the measurement plan.

STEP 03

Install

Install with local partners and inspect the agreed details.

STEP 04

Verify

Compare temperature and power under stated conditions.

Start with a free review of the information you have. We agree the scope and cost of any site visit or detailed measurement before proceeding.

03 · Shah Alam · Malaysia

Local work.
Measured results.

In Shah Alam, we analysed air-conditioning power before and after roof and wall heat-control work. After adjusting for outdoor temperature, estimated AC power was about 35% lower.

35%AC power reductionAdjusted for outdoor temperature
47.9%Reduction in the 32°C binOne of the measured temperature bins
On-site crew fitting reflective sheets to the ceiling
Local installation · Fitting the sheets to the ceiling.

One air-conditioned office, before and after combined roof and wall work. These are estimated AC power reductions, not electricity-bill savings or a guarantee for other facilities.

Measurement conditions

Estimated AC power is compared by outdoor temperature during periods with a 26°C set point. Results reflect combined roof and wall work and vary with the building and operating conditions.

Power use, before and after

Estimated AC power (kW) by outdoor temperature

Normal operation (before)
After heat-control work
Estimated AC power before and after heat-control work at 26 to 36 degrees Celsius. At 32 degrees, estimated AC power is 47.9 percent lower.

At 32°C outdoor temperature

47.9% lower
The gap between the lines shows the estimated power reduction. All 11 bins from 26 to 36°C are included. Reduction = (before − after) ÷ before; conditions and sample counts vary by bin.

What could change at your facility?

Tell us the location and the heat problem. We will help define the next step.

04 · Delivery & quality

Clear responsibilities.
Consistent quality.

A shared record of diagnosis, installation and results helps your local team and Japan headquarters assess the same project.

01

Heat-source diagnosis

Identify the dominant path before choosing the construction scope.

02

Standard procedure

Translate design intent into a clear installation and inspection plan.

03

On-site supervision

The supervision arrangement and inspection standard are agreed for each project.

04

Before / after evidence

Document conditions and measurement logic so the result can be reviewed.

Installation team gathered at the project site
Working together on site.

The on-site team. We align the installation approach and work together on local delivery.

Delivery structure

Diagnosis & project coordination

HouScape

The Japan and Singapore contact for your facility and headquarters teams. We coordinate diagnosis, installation arrangements and the measurement plan.

Company website →
Malaysia · Local engineering

ASAHI ENGINEERING
(MALAYSIA) SDN. BHD.

Your Malaysia contact, based in Kuala Lumpur. HVAC and building-services expertise supports local technical coordination and installation arrangements.

Company website →
Japan · Installation expertise

R-CRAFT

With nearly 20 years in heat-control work since 2008, R-CRAFT brings extensive factory installation experience. That experience guides precise installation suited to each site.

Company website →
05 · Best fit

For sites where heat affects
cost, people or quality.

Photos show R-CRAFT’s projects in Japan as references for facility types and installation approaches.

07 · FAQ

Questions before an assessment.

How is this different from reflective roof paint?

Reflective roof coatings reduce solar heat absorbed at the exposed roof surface. A reflective barrier reduces radiant heat transfer across an air space. We diagnose the building first, then select a suitable assembly and measurement plan.

Read the detailed comparison →

Do you always recommend roof work?

No. The dominant heat path may be the roof, walls, openings or operating conditions. We define the scope after reviewing the facility.

What do you need for the first review?

A short description of the heat problem, facility use, location and any available drawings, roof area or electricity data. It is fine if some information is not yet available.

Who performs the installation?

In Malaysia, R-CRAFT and ASAHI ENGINEERING (MALAYSIA) SDN. BHD. work with the local installation team. R-CRAFT provides specialist radiant-barrier installation expertise; ASAHI coordinates local engineering and installation arrangements. HouScape acts as the Japan contact, coordinating the project and measurement plan. For Singapore, HouScape receives enquiries and the installation team and scope are determined after a site survey.

Are there any downsides to reflective barriers?

Two are worth knowing, and we design around both. Large metal surfaces can affect Wi-Fi and mobile signal, so repeater placement and non-shielded zones are planned at the design stage. And a wrong moisture design can cause condensation, so ventilation and moisture balance are checked before the scope is finalized.

08 · Contact

Tell us where the heat is hurting.

A short message is enough. Area and drawings can be confirmed after your enquiry.

Malaysia · measure first. First 3 sites free.

Start with spot measurements of surface temperature, WBGT and AC power. We agree the location, measurement points and schedule beforehand. Uncooled areas focus on surface temperature and WBGT. Availability of the free offer and its scope are confirmed after enquiry. No installation contract is required.

Measurement & heat-control enquiry

First response: ASAHI · * Required

Start with the location and heat problem. Area, AC details and drawings can be confirmed later.

Initial information review is free. The first 3 measurement sites are free, subject to agreed eligibility, scope and scheduling. Additional investigation and installation are scoped separately.

MALAYSIA

ASAHI ENGINEERING
(MALAYSIA) SDN. BHD.

nobumasa-igi@asahikogyosha.co.jp+60 12-601 7874
E-28-01, Menara Suezcap 2, KL Gateway,
No. 2, Jalan Kerinchi, Gerbang Kerinchi Lestari,
59200 Kuala Lumpur, Malaysia