Factory heat control · for meeting attendees

Before deciding on work,
measure first.

Understand the hot areas and AC use, and prepare evidence for your next budget.

Malaysia · measure first. First 3 sites free.

Start with spot measurements of surface temperature, WBGT and AC power. We agree the location, measurement points and schedule beforehand. Uncooled areas focus on surface temperature and WBGT. Availability of the free offer and its scope are confirmed after enquiry. No installation contract is required.

Request a measurement consultation →

First response: ASAHI ENGINEERING (MALAYSIA) SDN. BHD.

Start with three site details.

  1. Facility location
  2. Approximate roof or floor area
  3. Whether the hot area is cooled or uncooled

Drawings and electricity data are not needed to start.

From measurement to priorities.

Record measurement points, time and AC operation, then review likely heat paths. Cooled areas focus on AC use; uncooled areas focus on conditions where people work. Spot readings do not establish annual savings.

Learn how radiant-barrier sheets work →
Local installation team
Japan and Malaysia teams coordinating site-specific work.

This is a HouScape enquiry page and does not imply JACTIM endorsement or certification.